Installer alert

Get the RSS feed of the ENERGEX Solar PV Installer updates

The following alerts provide solar PV installers with the latest information and changes about the installation process.

Subscribe to receive these alerts via email.


Volume 4 - 2012

Alert Title Date of Issue Alternative date
Volume 4, Issue 4 (375.5 KB) New Electrical Partners Portal is now LIVE! 02/04/2012 20120402
Volume 4, Issue 6 (319.0 KB) Allocation of additional connection points (NMI) to a premises with an existing network connection 11/05/2012 20120511
Volume 4, Issue 2 (373.8 KB) New Electrical Partners Portal March 2012 28/02/2012 20120228
Volume 4, Issue 1 (367.6 KB) Important information for Solar PV installers 15/02/2012 20120215
Volume 4, Issue 3 (378.2 KB) Outstanding Solar PV documentation 22/03/2012 20120322
Volume 4, Issue 5 (369.6 KB) Providing Inverter Details 24/04/2012 20120424

Volume 3 - 2011

Alert Title Date of Issue Alternative date
Volume 3, Issue 7 (50.2 KB) Changes to Federal and Queensland Government Solar Bonus Schemes – Cut-off dates for assessment 12/05/2011 20110512
Volume 3, Issue 5 (46.6 KB) Requirement for Network Connection Agreement prior to installation of Inverter Energy System 20/04/2011 20110420
Volume 3, Issue 6 (47.8 KB) Network investigation and approval timeframes to generate Network Connection Agreement to meet Solar Credit deadline 21/04/2011 20110421
Volume 3, Issue 8 (197.5 KB) ENERGEX website changes 30/05/2011 20110530
Volume 3, Issue 10 (134.1 KB) Household voltage impacted by solar PV 03/11/2011 20111103
Volume 3, Issue 4 (43.1 KB) Rejection of incomplete or duplicate Application Form 1003 25/03/2011 20110325
Volume 3, Issue 6a (45.7 KB) Clarification on timeframes from Installer Alert Volume 3, Issue 6 28/04/2011 20110428
Volume 3, Issue 1 (41.1 KB) Delays in meter installations due to flooding in South East Queensland 18/01/2011 20110118
Volume 3, Issue 2 (41.2 KB) Installer Alerts sent in December 2010 and January 2011 25/01/2011 20110125
Volume 3, Issue 9 (140.0 KB) Solar PV metering delays 03/06/2011 20110603

Volume 2 - 2010

Alert Title Date of Issue Alternative date
Volume 2, Issue 2 (43.3 KB) NMI Requirement on Application 23/04/2010 20100423
Volume 2, Issue 11 (58.4 KB) Agreement requirements 30/12/2010 20101230
Volume 2, Issue 3 (84.8 KB) Switchboard configuration to comply with Queensland Electricity Connection and Metering Manual 15/06/2010 20100615
Volume 2, Issue 8 (63.6 KB) Creation of new metering points (NMIs) for Inverter Energy Systems (Including Solar PV) 05/10/2010 20101005
Volume 2, Issue 9 (141.8 KB) Recent Release of Application Form 1003 24/11/2010 20101124
Volume 2, Issue 7 (49.1 KB) Update to Application (Form 1003) 17/08/2010 20100817
Volume 2, Issue 6 (60.4 KB) Multiple Inverters at Bulk Metered Sites 17/08/2010 20100817
Volume 2, Issue 10 (56.8 KB) Refresher information for Application Form 1003 30/12/2010 20101230
Volume 2, Issue 12 (41.5 KB) Possible delays in meter installation due to flood relief work 31/12/2010 20101231
Volume 2, Issue 5 (59.7 KB) Control Load Relay Requirements 20/07/2010 20100720
Volume 2, Issue 4 (42.3 KB) Rejection of Application to Network Connect an Inverter Energy System 18/06/2010 20100618
Volume 2, Issue 1 (55.5 KB) Customers qualifying for the Queensland Government Solar Bonus Scheme (Tariff 9900) 19/02/2010 20100219

Volume 1 - 2009

Alert Title Date of Issue Alternative date
Volume 1, Issue 6 (122.7 KB) Meters that read generation as positive consumption 04/12/2009 20091204
Volume 1, Issue 4 (101.4 KB) ‘Main switch first’ installations #2 19/11/2009 20091119
Volume 1, Issue 1 (73.8 KB) ‘Main switch first’ installations #1 10/09/2009 20090910
Volume 1, Issue 3 (77.2 KB) Application Form 1003 12/11/2009 20091112
Volume 1, Issue 2 (77.7 KB) Application (Form 1003) processing times 22/09/2009 20090922
Volume 1, Issue 5 (76.3 KB) Reminder regarding rejection of Application to Network Connect an Inverter Energy System 01/12/2009 20091201