Request for review of preliminary works plans form

Complete this form to request our review of your preliminary works plans affecting our underground electric powerlines (33kV or higher) for “in principle” assessment. This request is to be submitted only after our detailed underground powerline plans have been provided to you.

Please note: We may need up to 10 business days to action your request.

Please view our privacy statement regarding the collection of data.

Required fields are marked with an asterisk (*).

Contact Details
Please enter your best business hours contact number as 10 digits with no spaces
What is your role in the business?
Please ensure you complete a Before You Dig (BYD) enquiry before submitting this form
Brief Description of Works
Location of Works
This is the documentation you received as part of your BYD enquiry. Maximum file size is 5MB. *
Scan multiple documents into one file. Maximum file size is 5MB.
Preliminary Works Plans Please note: Failure to provide any of the below information may result in rejection of / delays in response to your request.
What phase is the project / works?
Do the proposed works comply with WP1323 and BYD conditions (based on available information)? Please refer to document WP1323 (PDF)
Have detailed underground cable plans been requested of and provided by us?
Has an on site electronic cable location been completed? This is carried out with a cable locator, usually by engaging a professional services locator. Drawings are usually provided to show the positions of the underground cables in relation to the proposed works.
Have our underground cables been visually located to confirm their position? This is usually a sketch confirming where the underground powerlines are in relation to the proposed works. Refer to WP1323 (PDF) and BYD conditions for visually locating underground cables.
Will the proposed works alter the surface level above our underground cables?
Will the proposed works change the surface type above our underground cables?
Will the proposed works affect access to our underground cables?
Will the proposed works potentially affect integrity / stability of our underground cables? For example, heavy machinery driving over cables or vibration caused by works
Please scan multiple documents into one file. Maximum file size is 5MB. *
Please scan multiple documents into one file. Maximum file size is 5MB.