Submission of detailed works plans form

Complete this form to request our assessment of your final works plans to identify objections or otherwise. Final design drawings/documentation should detail potential risks or ongoing effects to our electricity assets.

This form is only to be submitted after our detailed underground cable plans have been provided to you.

Please note: We may need up to 10 business days to action your request.

Please view our privacy statement regarding the collection of data.

Required fields are marked with an asterisk (*).

Contact Details
Please enter your best business hours contact number as 10 digits with no spaces
What is your role in the business?
Please ensure you complete a Before You Dig (BYD) enquiry before submitting this form
Brief Description of Works
Location of Works
This is the documentation you received as part of your BYD enquiry. Maximum file size is 5MB. *
Please scan all documents into one file. Maximum file size is 5MB.
Detailed Works Plans Please note: Failure to provide any of the below information may result in rejection of / delays in response to your submission.
If your proposed works will be on an easement, please confirm you have engaged and received advice from our Property Team
What phase is the project / works?
Do the proposed works comply with WP1323 and BYD conditions (based on available information)? Please refer to document WP1323 (PDF)
Will the proposed works alter the surface level above our underground cable?
Will the proposed works change the surface type above our underground cable?
Will the proposed works affect access to our underground cables?
Will the proposed works potentially affect integrity / stability of our underground cables? For example, heavy machinery driving over powerlines or vibration caused by works
Please scan multiple documents into one file. Maximum file size is 5MB. *
Scan multiple documents into one file. Maximum file size is 5MB.