New LV Solar and Renewable Enquiry, and Application fees - Effective 1 July 2026
The 2026-2027 Low Voltage (LV) Solar and Renewable Quoted fees for connection enquiries and applications will take effect from 1 July 2026.
< 30 kVA Negotiated Application Fees | ||
Category | Application Fee (GST Exclusive) | Application Fee (GST Inclusive) |
Negotiated (Standard connection) | $143.31 - $429.52 | $157 - $472 |
Dynamic (excludes Dynamic connections on SWER & Isolated networks) | $286.62 | $315 |
Connections on a SWER network | $429.52 – $1,433.12 | $472 - $1,576 |
Connections on an Isolated network | $429.52 – $1,433.12 | $472 - $1,576 |
Vehicle-to-Grid (V2G) | $143.31 - $1,433.12 | $157 - $1,576 |
Solar Share (IPSD) Connection | $8023.83 - $8598.72 | $8826 - $9,458 |
> 30 kVA Site Specific Enquiry Response Fee | ||
Category | Application Fee (GST Exclusive) | Application Fee (GST Inclusive) |
30 kVA – 200 kVA | $1,433.12 | $1,576 |
201 kVA – 1,499 kVA | ||
Fixed EG systems Bumpless Transfer Stand-by (for testing only) | ||
Connections with Construction Works | As Quoted | As Quoted |
Connections with multiple connection points | As Quoted | As Quoted |
> 30 kVA Application Fees | ||
Category | Application Fee (GST Exclusive) | Application Fee (GST Inclusive) |
Basic Connection (Inverter Energy System (IES) including Energy Storage System (ESS)) | $1,146.50 | $1,261 |
30 kVA – 200 kVA | $3,436.18 | $3,779 |
30 kVA – 200 kVA SWER Connections | $3,436.18 - $4,442.67 | $3,779 - $4,886 |
Connections on Isolated Networks | $4,872.61 - $8,455.41 | $5,359 – $9,300 |
Connections with Solar Share (IPSD) | $8,025.47 - $10,318.46 | $8,828 - $11,350 |
201 kVA – 1,499 kVA | As Quoted | |
Fixed EG – Bumpless transfer | As Quoted | |
Fixed EG – Standby (for testing only) | As Quoted | |
Premises with multiple connection points | As Quoted | |
Embedded Networks | As Quoted | |
DER Construction Projects where Network Augmentation is Required | As Quoted | |
Site Specific Advice Fees | ||
Service Type | Service Description | Fee
|
Site Specific Advice | Embedded Network / Bulk Metered Site investigation | As Quoted |
Site Specific Advice | Technical Advice service | As Quoted |
Site Specific Advice | Consultation Service | As Quoted |
Non-Standard Connection | Non-Standard / Dispensation request | As Quoted |
DCR resubmission | Review of revised DCR | As Quoted |
CR resubmission | Review of revised CR | As Quoted |
Revised Technical Study | Revised Technical Study | As Quoted |
The updated fees will be published on our network websites and can be accessed via the Solar connections & other technologies web page.
The new fees will apply to all enquiry and application submissions received on or after 1 July 2026.
For systems > 30 kVA, the application fee will continue to be provided in the Site-Specific Enquiry (SSER) response.
Please ensure your customers are made aware of the relevant fees at the time of enquiry or application.